Double door vacuum oven
Content
Use:Quickly remove the moisture from the core / grade sheet / coil.
Box Structure:Three layer single door (3 doors) sealed door is aluminum alloy, flexible and automatic adjustment, with heat storage and explosion-proof functions
control mode:PLC automatic program control, 7 pairs of color display large screen in machine operation, automatic program centralized control.
1. The equipment has manual / automatic switching function.
2. When it is in manual mode, it can be heated separately. Vacuumize and fill with nitrogen. Cooling function.
3. When it is in the automatic state, press the automatic start button to operate according to the set process parameters (vacuum pumping - nitrogen filling - heating - vacuum baking)
(realize the alternating cycle process of vacuumizing / filling nitrogen to automatically replace water and gas) cooling (start the water cooling system to cool nitrogen. Realize the hot ammonia in the cavity
Once the operation is completed (ammonia gas is maintained and audible and visual alarm is given)
Main parameters: temperature 100-350 ℃, temperature rise 200 ℃ ≤ 20min, temperature control ± 0.2 ℃, vacuum degree ≤ 10Pa, 24h air leakage ≤ 200Pa
Box Structure:Three layer single door (3 doors) sealed door is aluminum alloy, flexible and automatic adjustment, with heat storage and explosion-proof functions
control mode:PLC automatic program control, 7 pairs of color display large screen in machine operation, automatic program centralized control.
1. The equipment has manual / automatic switching function.
2. When it is in manual mode, it can be heated separately. Vacuumize and fill with nitrogen. Cooling function.
3. When it is in the automatic state, press the automatic start button to operate according to the set process parameters (vacuum pumping - nitrogen filling - heating - vacuum baking)
(realize the alternating cycle process of vacuumizing / filling nitrogen to automatically replace water and gas) cooling (start the water cooling system to cool nitrogen. Realize the hot ammonia in the cavity
Once the operation is completed (ammonia gas is maintained and audible and visual alarm is given)
Main parameters: temperature 100-350 ℃, temperature rise 200 ℃ ≤ 20min, temperature control ± 0.2 ℃, vacuum degree ≤ 10Pa, 24h air leakage ≤ 200Pa